MTC Consulting and Design - Traffic Management Design and Planning Ireland

About

MTC Consulting and Design design, plan, monitor and maintain effectiveness of temporary traffic management schemes throughout Ireland - services include:

  • Drawings
  • Site Visits
  • Method Statement
  • Risk Assessment

Reference projects include:

  • M50 and N7 schemes including the Newlands Cross improvement 
  • N24 convoy systems
  • Sseveral bridge projects for Irish Rail and Local Authorities.

MTC Consulting and Design are fully insured with both Public Liability and Professional Indemnity.

Qualifications include LASNTG and CSCS.

Bulletin Board
Post comment

Bulletin Board (geoPush)

Tomasz Slonina

Fully Insured - Public Liability and Professional Indemnity

Tomasz Slonina

- Traffic Management Plans
-Method Statements
-Risk Assessment

Products & services

The company will provide Temporary Traffic Management Plans Projects. Temporary Traffic Management Plans are dedicated to providing the users and workers with effective protection, maximise the safety of the workforce and the travelling public and also to keep traffic flowing as freely as possible.

All the projects will be designed in accordance with Traffic Signs Manual Chapter 8, Guidance for the Control and Management of Traffic at Road Works & HAS Guidelines for Working on Roads.

I will be able to offer a complete traffic management plans for roadwork's sites on all types/levels of road, ranging from single carriageway rural roads to high speed 3 lane motorways and interchanges.

Pedestrian Management Plans -  Stop & Go system -  Traffic Lights Systems -  Diversion Routes -  Contra-flow systems -  Convoy Systems -  Lane Closures on Dual Carriageway Roads, etc.

Products & services

Drainage Project at Drom, Roscrea, Co Tipperary.

The picture on the left shows a plan I completed for North Tipperary County Council. It was for a drainage project in the Roscrea area.

Previously the road was blocked at numerous times every year and the road became impassable.

A solution was devised to remove the water from the road and link to an existing drainage system.

This was done over a distance of 300 metres and required extensive measuring as the levels were quite varied.

Products & services

Traffic Management Plan in Fingal, Co. Dublin.

This was a traffic management plan I completed for Lagan Asphalt on behalf of Fingal County Council.

The plan was required to safely manage the flow of traffic while the entire area was being resurfaced.

The work was done in 5 phases and throughout each phase the t raffic was redirected and managed quite effectively and the project was finished on schedule.

In this situation there was no existing map of the area and it was necessary to create the background map before planning the project.

Products & services

Our Client Interaction works as follows:

1. Confirm contract with client.

2. Establish detailed information about the site location and the proposed work contract.  

3. Site visit to inspect the ground conditions / considerations.

4. Document all relevant information and incorporate into a Management Plan, Method Statement and Risk Assessment.

5. Sending the product via e-mail.

more...